Digging Deep. Delivering Excellence.
On steep mountain terrain, soil loss happens fast and costs plenty. Around Asheville, your site likely sits on Ashe, Evard, or Clifton clay loams that turn to mud the moment Appalachian rain hits them. On a bare cut-and-fill slope, that runoff carves rill and gully channels, strips topsoil, and dumps silt onto your neighbor’s lower parcel or into a protected mountain stream. That’s how projects earn Stop Work Orders and fines.
Mitchell Construction Co. LLC keeps sites protected and compliant. We’ve run erosion control across Fairview, Haw Creek, Leicester, North Asheville, and Black Mountain. We know how these soils erode. We know how fast water moves on a grade. And we know exactly what the Buncombe County Soil Erosion and Sedimentation Control Division expects before and during a disturbance.
What’s in it for you? No costly shutdowns, no environmental penalties, and a site that holds through the worst cloudburst. We handle your Buncombe County erosion and sedimentation control permit from the pre-construction meeting forward.
Hire us, and you’re hiring crews who work Buncombe and Henderson County slopes every week. This is our terrain.
Mike GonneringTrustindex verifies that the original source of the review is Google. We have worked with Beeman Excavating in the past. Their experience in multiple markets has shown through in the quality of their work. Recommend you give them a try! Jose GarciaTrustindex verifies that the original source of the review is Google. Hannah BeemanTrustindex verifies that the original source of the review is Google. Beeman Excavating is a great family owned company. They are easy to work with, responsive and respectful. I highly recommend them!
From residential projects to commercial developments, we provide end-to-end solutions for every stage of construction.
Reliable erosion control is about controlling water velocity and catching sediment before it leaves your site. We don’t drop a silt fence and walk away. We layer active and passive protection across the whole disturbance.
First, we lock down the perimeter. We install wire-backed silt fence, compost filter socks, and rock inlet protection along every low-side boundary. Then we slow the water. Temporary water bars, slope drains, and rip-rap check dams break up concentrated flow before it can channel.
Next, we armor the slope. On grades steeper than 2:1, we apply rolled erosion control products and turf reinforcement mats to hold the soil in place. Then we establish cover fast — steep slope hydroseeding and tackifier application in Asheville, using bonded fiber matrix to hit North Carolina’s 21-day stabilization deadline.
What’s in it for you? Sediment stays on your site, your topsoil stays put, and inspectors sign off without delay. We keep hauling tight along I-26, I-40, and US-19/23.
From temporary sediment trap and basin excavation across WNC to permanent ground cover, we protect your site and your budget.
A builder off US-19/23 in Leicester had a 2:1 cut slope washing out in Evard clay loam after every storm. We installed rolled erosion control matting, built rip-rap check dams to slow runoff, and hydroseeded with a bonded fiber matrix tackifier. Vegetation established inside the 21-day window, and the slope held through the next heavy rain.
On a Haw Creek site draining toward a French Broad tributary, we protected the trout buffer with a high-capacity sediment basin and a temporary rock dam. Wire-backed silt fence and flocculant applications kept turbidity out of the coldwater stream. The project stayed compliant with NCDEQ rules and avoided any sedimentation fines.
Take a look at some of our latest work. Scroll through the photos below to see our team in action and the results we deliver.
On natural slopes of 25% or greater, Buncombe County’s Hillside rule requires a permit for disturbing just a quarter acre. Standard terrain triggers at one acre. Steep mountain lots almost always cross the line early — we confirm your threshold upfront.
We hydroseed with wood-fiber mulch and bonded fiber matrix tackifiers for fast growth, and armor steep grades with rolled erosion control products or turf reinforcement mats. Together they meet the 21-day rule on cut slopes.
We install perimeter silt fence and compost filter socks along low-side boundaries, then slow flow with check dams and route it to a sediment trap. Silt settles on your site, not downstream.
We work the buffer with high-capacity sediment basins, temporary rock dams, and flocculant applications that drop suspended solids fast. This keeps muddy water out of coldwater mountain ecosystems and your project within NCDEQ rules.
If you disturb an acre or more, yes — NCG01 coverage applies. We manage the pre-construction meeting, design controls to 25-year storm criteria, and maintain them through closeout, so coverage never stalls your build.